|
Observatory Construction Blog - page 13 |
02APR2005
|
Completed installing the ridge-caps, the roof is finished. Started the exterior trim and staining. Tomorrow, the faux moon door. |
Illustration 1 Front-west
view, completed roof
Illustration
2 Rear-view
|
03APR2005
Austin was impressed with my circle drawing ability. We got the main exterior trim done and the staining. All that's left now is the decorative lattice work, that will take a whole weekend. I feel guilty about leaving for the Mid-South StarGaze, but Austin says not to worry, when I get back, it will be all done! |
Illustration 3 Day's End
03APR2005