|
Observatory Construction Blog - page 8 |
26FEB2005
|
Finished installing the panels on the fourth wall where the door goes. And here we are at the fun part. The rails are 1.5" angle iron, installed with the angle up. V-grooved wheels will ride along this rail, providing the roof roll-off function. |
Illustration 1 Wall
Corner Brace
Illustration 2 Closeup
of Rolling Mechanism
|
The actual roof will be installed on top of the rolling mechanism. Challenging, but not impossible. |
Illustration 3 Another
Closeup
Illustration 3 Days End
26FEB2005